Tuesday, 20 October 2026
Englishहिन्दीMarathi
City News Mumbai
City News Mumbai
HomeE-PaperVideosNationalMumbaiPoliticsSportsHealthTechnologyCrimeHistory
TopNationalMumbaiPoliticsSportsHealthTechnologyCrimeHistory

City News Mumbai

Every News from Mumbai, First.

Categories

  • Local
  • National
  • Politics
  • Business
  • Technology
  • Sports
  • Health
  • Education

Quick Links

  • Home
  • E-Paper
  • Videos
  • Picture of the Day
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms of Service

Newsroom

  • Editorial Policy
  • Corrections & Complaints
  • Advertise With Us
  • Newsroom Contact

Languages

  • English
  • हिन्दी (Hindi)
  • मराठी (Marathi)

Follow Us

Email: citynewsmumbai@gmail.com

Phone: 9869128483

© 2026 City News Mumbai. All rights reserved

Designed and Developed byZeloiteZeloite
Pilot 24×7 waste collection project launched in Mumbai, new initiative in Bandra.
  1. Home
  2. Maharashtra
Maharashtra

Pilot 24×7 waste collection project launched in Mumbai, new initiative in Bandra.

City News Mumbai•5 September 2026 at 06:55 am•4 views•2 min read

The Mumbai Municipal Corporation has launched a 24‑hour waste collection pilot in Bandra. This initiative was designed to address the city’s waste management problems and improve sanitation levels.

Mumbai, September 5, 2026 – BMC Launches 24‑Hour Waste Collection Pilot Project in Bandra

Mumbai, September 5, 2026 – The Municipal Corporation of Mumbai (BMC) has launched a 24‑hour waste collection pilot project in the Bandra area, taking a significant step towards addressing the city’s growing waste‑management challenge. The initiative aims to eliminate delays in waste disposal, reduce public‑health risks caused by litter, and provide better services to citizens. A senior BMC official stated that the pilot will collect 500 tonnes of waste daily in two shifts, achieving greater efficiency than the existing two‑shift system.

The primary reason behind the pilot project is the continual growth in Mumbai’s population and the resulting increase in waste production due to urbanisation. In 2025, BMC estimated that the city generates approximately 4,800 tonnes of waste per day, while the existing collection system is often overloaded. Bandra, known for its busy commercial and residential zones, was chosen as the first site for the pilot.

BMC has purchased new waste‑collection trucks for the scheme, equipped with GPS tracking and real‑time data‑monitoring systems. This will improve collection accuracy and reduce the likelihood of litter piles accumulating. Additionally, the municipal corporation has provided extra training to local sanitation workers so that they can work safely and effectively even at night.

Key benefits of the project include reduced flooding and waterborne diseases caused by waste accumulation, improved street cleanliness, and enhanced quality of life for citizens. BMC has stated that, based on the pilot’s results, the model could be expanded throughout the city.

City environmental specialist Dr. Anita Patil commented
Share:

More from Maharashtra

Devotees swarm to see Goddess Durga, enthusiasm in Garba‑Dandiya.
Maharashtra

Devotees swarm to see Goddess Durga, enthusiasm in Garba‑Dandiya.

18 Oct 2026
Six Socialist Party municipal councillors expelled over selection of approved councillor.
Maharashtra

Six Socialist Party municipal councillors expelled over selection of approved councillor.

16 Oct 2026
Approval of appointment of 9 elected councilors in Bhivandi Municipal Corporation, Congress in turmoil.
Maharashtra

Approval of appointment of 9 elected councilors in Bhivandi Municipal Corporation, Congress in turmoil.

15 Oct 2026
Bulldozer runs on four‑storey building in Bhivandi under court order.
Maharashtra

Bulldozer runs on four‑storey building in Bhivandi under court order.

14 Oct 2026
98‑year‑old private lease on 3,500 acres of ST land......?
Maharashtra

98‑year‑old private lease on 3,500 acres of ST land......?

10 Oct 2026
Disgruntled farmers block the Viraar‑Alibag corridor over low compensation.
Maharashtra

Disgruntled farmers block the Viraar‑Alibag corridor over low compensation.

7 Oct 2026